Kingtronics Diode and Bridge Rectifier

Tenha bons dias de primavera!
Após o retificador de diodo e ponte poder ser usado na produção de iluminação, eles são os mais vendidos da Kingtronics.
Abaixo da tabela para sua referência, comparando com outros fornecedores, temos uma enorme vantagem no suporte ao lead time!
Você tem um novo plano de pedidos em mãos? compartilhe com sua equipe de vendas da Kingtronics para obter as melhores ofertas!

Technology

Suppliers

Lead Time

Kingtronics Lead Time

Diodes & Bridge Rectifiers

Diodes Inc

16-32 weeks

Diode M7 stock or 2-5 weeks;                 Diode LL4148 stock or 9-11 weeks;        other Diodes and Bridge about 5-11 weeks

ON Semiconductor

8-12 weeks

Fairchild

12-16 weeks

Vishay

12-22 weeks

STMicroelectronics

10-32 weeks

vídeo do produtohttps://www.youtube.com/watch?v=m3-DJONbqvU
Retificadores de diodo SGS RoHS Certificationhttp://www.kingtronics.com/pdf/Diodes-Rectifiers-RoHS.pdf

Kingtronics P/N

Package

Packing

Spq

Diode

 

 

 

SMAJ18A

SMA

T&R

5kpcs/Reel

SMBJ18A

SMB

T&R

3kpcs/Reel

ER2DA

SMA

T&R

5kpcs/Reel

ES2G

SMB

T&R

3kpcs/Reel

ES3J

SMB

T&R

3kpcs/Reel

S1M

SMA

T&R

5kpcs/Reel

ES1J

SMA

T&R

5kpcs/Reel

GS1M

SMA

T&R

5kpcs/Reel

1N4007

DO-41

Ammo/ Bulk

5kpcs/ Ammo

1N4148WS

SOD-323

T&R

3kpcs/Reel

FR107

DO-41

Ammo/ Bulk

5kpcs/ Ammo

 

 

 

 

Transistor

 

 

 

BAS21 

SOT-23

T&R

3kpcs/Reel

BAV99

SOT-23

T&R

3kpcs/Reel

BC817-40

SOT-23

T&R

3kpcs/Reel

BC847A

SOT-23

T&R

3kpcs/Reel

 

 

 

 

Bridge Rectifier

 

 

 

AB10S

ABS

T&R

5kpcs/reel

DB107S

DBS

T&R

5kpcs/reel

MB10S

MBS

T&R

3kpcs/Reel

MB10F

MBF

T&R

5kpcs/reel

Kt Kingtronics Support Zener Diodes 1N4148 and LL4148

O Zener Diodes é de uso geral e adequado para muitas aplicações diferentes, como: Industrial, Gerenciamento de energia, Eletrônicos, Dispositivos portáteis e Automotivo.

Diodo Planar Epitaxial 1N4148 do Switching do silicone Especificação:
Diodo Planar Epitaxial Do Switching Do Silicone Do Pacote DO-34, DO-35
Diodo Planar Epitaxial Do Switching Do Silicone De alta velocidade Do Switching
Este diodo também está disponível na caixa MiniMELF com a designação de tipo LL4148
Disponível com 1N4148
 
Diodo de comutação rápido LL4148 Minimelf SOD80 Especificação:
Diodo de sinal pequeno LL4148
Diodo de montagem em superfície de comutação rápida
Baixo vazamento reverso
Velocidade de comutação rápida
Dissipação máxima de potência 500mW
Alta estabilidade e alta confiabilidade

Kt Kingtronics File Global Lead Time Information in Electronics Industry

ACTIVES

 

Technology

Manufacturer

Current Lead-Times

Lead-Times Trend

Comments

 
 

Rectifiers

Diodes Inc

12-24

Increasing

Schottky rectifiers SOT23 and SOD323 20- 24 weeks, PDI123 21 weeks, SBR TO220AB 12-20 weeks, SMA 16-18 weeks.

 

Vishay

16-52

Increasing

There are increased lead times in SMA, SMB, SMC, TO-220, TO-263 and DPAK. Schottkys are most affected with 40-52 weeks lead time.

 

ON Semiconductor

18-42

Increasing

SOD123 flat lead, SOT23 copper and SMA Flat lead 36-42 weeks lead time. Automotive parts 26-32 weeks

 

STMicroelectronics

20-33

Increasing

TURBO 2 Ultrafast High Voltage Rectifiers running about 20 weeks. Everything else is 25-33 weeks.

 

Fairchild

12-14

Stable

 

 

TVS Diodes

Diodes Inc

12-16

Increasing

 

 

Littelfuse

16

Increasing

Purchased ON Semi TVS business Lead times 24 weeks

 

Vishay

25-40

Increasing

SMC at 25 weeks SMA and SMB at 40

 

STMicroelectronics

8

Stable

 

 

Schottky Diodes

Diodes Inc

12-22

Increasing

 

 

Nexperia

20-40

Increasing

SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS

 

ON Semiconductor

20-40

Increasing

SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS

 

Fairchild

16-45

Increasing

 

 

Switching Diodes

Diodes Inc

12-22

Increasing

 

 

Fairchild

16-45

Increasing

 

 

ON Semiconductor

16-40

Increasing

SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS

 

Nexperia

20-40

Increasing

SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS

 

Zener Diodes

Diodes Inc

12-22

Increasing

 

 

Fairchild

10-30

Increasing

 

 

Nexperia

6-40

Increasing

SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS

 

ON Semiconductor

12-40

Increasing

SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS

 

Vishay

12-44

Increasing

SMA SMB - 28-44 WEEKS

 

Bridge Rectifiers

Diodes Inc

16-30

Increasing

DFxx series 25-30 weeks, KBPxx series 21-25 weeks.

 

Fairchild

12-42

Increasing

 

 

Vishay

19-45

Increasing

 

 

General Purpose Transistors

Diodes Inc

12-22

Increasing

 

 

Fairchild

10-40

Increasing

 

 

Nexperia

13-40

Increasing

SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS

 

ON Semiconductor

12-40

Increasing

SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS

 

Rohm Semiconductor

10-60

Increasing

The following packages have been extended to 40 weeks CPT - TSMT356 - TSMT36M - TSMT8 - TSMT8M - SOP8 - UMD2M - USM - EMD2M - EMD2 - TUSH/TUMD2S - PMDU - PMDUM – PSM – PMDS - SSOP5 - SSOP6

 

PASSIVES

 

Trimmers & Pots

BI Tech

8-12

Stable

 

 

Piher

10-14

Stable

 

 

Panasonic

14-16

Decreasing

Pots will be EOL by the end of 2017

 

Vishay

10-14

Stable

 

 

Electrolytic

NIC Components

18-20

Increasing

Leadtimes pushed out. Some pricing has been increased. Pushouts some cases 40 weeks

 

Nichion

18-28

Stable

SMD 10x10,8x10,6.3x7.7 Leadtimes coming down now between 18-24, Snap-in still 28-30, price increases happening

 

Surge

14-19

Increasing

Lead-times pushing out closing on 20 weeks on some products

 

Panasonic

14-18

Decreasing

Some SMD dropping from 18 to 16 weeks. Some price increases.

 

United Chemicon

16-20

Increasing

Leadtimes increasing the 18-20 weeks

 

Capacitors - Tantalum

AVX

20-28

Increasing

Long lead-times across all case sizes

 

Vishay

15-20

Increasing

Lead-times extending on small case sizes A & B

 

Leaded Capacitors - Ceramic

AVX

18-20

Stable

 

 

Murata

18-20

Stable

A lot of parts EOL'd

 

Vishay

12-16

Stable

 

 

NIC Components

14-18

Increasing

 

 

TDK

14-20

Increasing

 

 

Surface Mount General Capacitors – Ceramic

AVX

24+

Increasing

Automotive Specs Sold Out, Allocation on 44 series of parts. Controlled order entry on long list of parts

 

Murata

20-38+

Increasing

Controlled order entry on a long list of parts, mostly large case sizes. EOL notification on many parts

 

Samsung

24+

Increasing

Lead times under pressure, price increases in Q1 2018

 

TDK

24+

Increasing

On severe allocation

 

Taiyo Yuden

30+

Increasing

On severe allocation

 

NIC Components

24+

Increasing

 

 

Yageo

38+

Increasing

Price increase in Q1 2018, Controlled order entry on long list of parts

 

Walsin

40+

Increasing

 

 

Vishay

16+

Stable

 

 

 

Page:[«]1[»]