Kt Screw Electrolytic Capacitors

Kingtronics Screw & Lug tipo E-cap é projetado para controle de equipamento industrial, computador, poderes de comunicação circuito Hi-ripple de veículo elétrico e inversor, etc.Ambos os tipos estão disponíveis na faixa de <1 μF a vários farads com tensões de trabalho de até várias centenas de volts CC.

Abaixo está a tabela de recursos, também podemos personalizar a solicitação! Bem-vindo, compartilhe sua consulta conosco para verificar a melhor oferta para você.

Series name

GKT-CA 85°C 2000 hrs High Ripple Current

GKT-CB 105°C 2000 hrs High Ripple Current

GKT-UA 85°C 1000 hrs Standard part

type

Screw type

Lug Type

Rated Voltage

10V - 450V.DC

10V - 400V.DC

16V - 450V.DC

Operating Temperature

 -40~+85

-40~+105

-40~+85

Various dimensions

36*53mm - 90*236mm

35*50mm - 89*140mm

 22*30mm - 40*100mm

 Kingtronics Screw & Lug type Aluminum Electrolytic Capacitors

Kingtronics CNY Holiday & Lead Time Problem

O Ano Novo Lunar Chinês se aproxima no próximo mês.
Os escritórios de vendas da Kingtronics terão férias de 12 a 15 de fevereiro.
Mas a partir do início de fevereiro, nossas linhas de produção terão férias de 2-3 semanas.
O prazo de entrega será estendido em conformidade.

Enquanto isso, o fornecimento de material está instável no mercado recentemente, o que também leva a um prazo de entrega mais longo.
Se houver algum plano de pedido, fique à vontade para confirmar com antecedência para brigar por melhores datas de entrega.

Série de venda quente da Kingtronics:
Potenciômetro de corte RKT RKT-3006, RKT-3266, RKT-3269, RKT-3296, RKT-3323, RKT-3329, RKT-3362, RKT-3386, RKT-3306, RKT-3309, RKT-3540S, RKT- 3590, RKT-C3305, RKT-065
GKT-Capacitor eletrolítico de alumínio Tipo Axial, Tipo Radial, Tipo Snap-in, Tipo Parafuso e Tipo Lug e Tipo Chip SMD

Capacitor de cerâmica multicamada MKT-Radial
Capacitor aparador cerâmico com chip KKT-3mm 3pF, 6pF, 10pF, 20pF, 30pF

Kingtronics CNY Holiday & Lead Time Problem

Kt 3MM Ceramic Trimmer Capacitors

Kingtronics fornece capacitores de aparador cerâmicos estáveis ​​e de boa qualidade com bom tempo de execução.

Embora a parada Murata ofereça a série TZC3, mas com os capacitores aparadores cerâmicos Kingtronics 3MM (série KKT) você não precisa se preocupar com isso.
Bem-vindo para qualquer inquérito.
 
Recursos
* Desvio de baixa capacitância
* Alta durabilidade de vibração, poeira, umidade e fluxo
* A caixa com código de cores permite fácil identificação
* Muito bom Q e alta frequência de ressonância
* Projetado para soldagem por refluxo.
* Tamanho pequeno com dimensão externa de 3,2 (L) x 4,5 (L) x 1,5 (T) mm
 
Formulários
* Sistema remoto de entrada sem chave, instrumento de medição
* Controle remoto de alarme de carro, áudio do carro, leitor de cartão de tráfego
* Sistema de segurança, microfone sem fio
* Telefone sem fio, repetidor sem fio
* Comunicação de rádio bidirecional (FRS, GMRS, LMR)
* TCXO, VCXO, Módulo RF, RFID, DVD
 
Vídeo do produto: https://www.youtube.com/watch?v=Men9BCDlODk
 
Prazo de execução: estoque normal ~ 4 semanas
Referência cruzada para Kingtronics e Murata P / N
 

Kingtronics P/N 

Murata P/N 

Capacitance (pF MAX)

KKT303TR (Black)

TZC3Z030 (Brown, Black)

3pF

KKT306TR (Blue)

TZC3Z060 (Blue, Black)

6pF

KKT310TR (Ivory)

TZC3Z100 (White, Black)

10pF

KKT320TR (Pink)

TZC3Z200 (Red, Black)

20pF

KKT330TR (Green)

TZC3Z300 (Green, Black)

30pF

Kt Through-Hole Cermet Consumer

Consumidor de Cermet através do furo da Kingtronics com excelente preço e suporte de prazo de entrega, sua consulta é bem-vinda.

RKT-3306 6 mm Through-Hole Cermet Consumer
RKT-3309 9 mm através do orifício de cermet Consumidor


Estilos de terminal: 3306F 3306K 3309P 3309W
Prazo de execução: 4-7 semanas

Vídeo do produto: https://www.youtube.com/watch?v=PByDraT2Iww

**Recursos:
Potenciômetro de corte do consumidor
Potenciômetro de corte de cermet
Potenciômetro de ajuste de uma volta
Rotor de fenda cruzada
Estilos de ajuste horizontal e vertical

Kt Screw Type,Coin Type Super Capacitors

Como você sabe, existem poucas fábricas atualmente produzindo super capacitores na China por causa de equipamentos ou profissionais técnicos.

Os super capacitores Kingtronics oferecem armazenamento de energia de alta confiabilidade, alta potência, baixo ESR e capacitância ultra-alta, utilizando processos e materiais proprietários e ecológicos.

Esses ultra-capacitores são projetados para aplicações de energia de reserva, potência de pulso, micro grade de distribuição, dispositivos médicos e coleta de energia.

 Kt Screw Type and Coin Type Super Capacitors

Kt Brief Knowledge of Super Capacitor

Super capacitores, também conhecidos como capacitores eletroquímicos (capacitores elétricos de dupla camada), capacitores de ouro, capacitores farad.
É um tipo de eletroquímica e componente desenvolvido nas décadas de 70 e 80 do século passado para armazenar energia através de eletrólitos polarizados.
É uma fonte de alimentação com desempenho especial entre capacitores e baterias tradicionais.

Os recursos são:
* Maior capacitância que capacitores eletrolíticos, Maior potência que baterias secundárias
*Segurança
* Base não química
* o mecanismo de carregamento-descarga fornece segurança contra fatores de risco comparando baterias secundárias
*Ambiente amigável
* Milhões de vezes no ciclo de carga-descarga Ciclo de vida semi permanente

Inscrição:
Telefones inteligentes, PDAs, câmeras digitais,
SSD, ferramentas manuais, eletroeletrônicos
Modem GPS

A série Kingtronics DKT pode ajudá-lo com a necessidade do Super Capacitor, bem-vindo ao verificar a nossa melhor oferta a qualquer momento.

Super Capacitors Radial, Snap-in, Screw and Coin type

Kingtronics P/N

Rated Voltage

Temperatures

Characteristic

DKT-DA

5.5V

-25~+70°C

Coin type, large capacity

DKT-DZ

2.7-3V

-40~+70°C

Radial/Snap-in/Screw type, low ESR


Kt Offers Stable Price and Shorter L/T

Seus fornecedores de capacitores eletrolíticos de alumínio informaram que o preço e a L / T aumentarão muito mais no futuro próximo?

A Kingtronics pode oferecer um preço estável e menor L / T do que os principais fornecedores, conforme abaixo. Nosso prazo de entrega é de apenas 5 a 9 semanas.

Também podemos discutir mais sobre a Electronica 2018 em Munique. Você tem planos para isso?

Technology Manufacturer Lead-Times Lead-Times Trend Comments
Electrolytic Capacitors NIC Components 18-20 Increasing L/T pushed out. Some pricing has been increased. Pushouts some cases 40 weeks
Nichion 18-28 Stable SMD 10x10,8x10,6.3x7.7 L/T coming down now between 18-24, Snap-in still 28-30, price increases happening
Surge 14-19 Increasing Lead-times pushing out closing on 20 weeks on some products
Panasonic 14-18 Decreasing Some SMD dropping from 18 to 16 weeks. Some price increases.
United Chemicon 16-20 Increasing L/T increasing the 18-20 weeks

Kt Kingtronics File Global Lead Time Information in Electronics Industry

ACTIVES

 

Technology

Manufacturer

Current Lead-Times

Lead-Times Trend

Comments

 
 

Rectifiers

Diodes Inc

12-24

Increasing

Schottky rectifiers SOT23 and SOD323 20- 24 weeks, PDI123 21 weeks, SBR TO220AB 12-20 weeks, SMA 16-18 weeks.

 

Vishay

16-52

Increasing

There are increased lead times in SMA, SMB, SMC, TO-220, TO-263 and DPAK. Schottkys are most affected with 40-52 weeks lead time.

 

ON Semiconductor

18-42

Increasing

SOD123 flat lead, SOT23 copper and SMA Flat lead 36-42 weeks lead time. Automotive parts 26-32 weeks

 

STMicroelectronics

20-33

Increasing

TURBO 2 Ultrafast High Voltage Rectifiers running about 20 weeks. Everything else is 25-33 weeks.

 

Fairchild

12-14

Stable

 

 

TVS Diodes

Diodes Inc

12-16

Increasing

 

 

Littelfuse

16

Increasing

Purchased ON Semi TVS business Lead times 24 weeks

 

Vishay

25-40

Increasing

SMC at 25 weeks SMA and SMB at 40

 

STMicroelectronics

8

Stable

 

 

Schottky Diodes

Diodes Inc

12-22

Increasing

 

 

Nexperia

20-40

Increasing

SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS

 

ON Semiconductor

20-40

Increasing

SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS

 

Fairchild

16-45

Increasing

 

 

Switching Diodes

Diodes Inc

12-22

Increasing

 

 

Fairchild

16-45

Increasing

 

 

ON Semiconductor

16-40

Increasing

SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS

 

Nexperia

20-40

Increasing

SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS

 

Zener Diodes

Diodes Inc

12-22

Increasing

 

 

Fairchild

10-30

Increasing

 

 

Nexperia

6-40

Increasing

SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS

 

ON Semiconductor

12-40

Increasing

SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS

 

Vishay

12-44

Increasing

SMA SMB - 28-44 WEEKS

 

Bridge Rectifiers

Diodes Inc

16-30

Increasing

DFxx series 25-30 weeks, KBPxx series 21-25 weeks.

 

Fairchild

12-42

Increasing

 

 

Vishay

19-45

Increasing

 

 

General Purpose Transistors

Diodes Inc

12-22

Increasing

 

 

Fairchild

10-40

Increasing

 

 

Nexperia

13-40

Increasing

SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS

 

ON Semiconductor

12-40

Increasing

SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS

 

Rohm Semiconductor

10-60

Increasing

The following packages have been extended to 40 weeks CPT - TSMT356 - TSMT36M - TSMT8 - TSMT8M - SOP8 - UMD2M - USM - EMD2M - EMD2 - TUSH/TUMD2S - PMDU - PMDUM – PSM – PMDS - SSOP5 - SSOP6

 

PASSIVES

 

Trimmers & Pots

BI Tech

8-12

Stable

 

 

Piher

10-14

Stable

 

 

Panasonic

14-16

Decreasing

Pots will be EOL by the end of 2017

 

Vishay

10-14

Stable

 

 

Electrolytic

NIC Components

18-20

Increasing

Leadtimes pushed out. Some pricing has been increased. Pushouts some cases 40 weeks

 

Nichion

18-28

Stable

SMD 10x10,8x10,6.3x7.7 Leadtimes coming down now between 18-24, Snap-in still 28-30, price increases happening

 

Surge

14-19

Increasing

Lead-times pushing out closing on 20 weeks on some products

 

Panasonic

14-18

Decreasing

Some SMD dropping from 18 to 16 weeks. Some price increases.

 

United Chemicon

16-20

Increasing

Leadtimes increasing the 18-20 weeks

 

Capacitors - Tantalum

AVX

20-28

Increasing

Long lead-times across all case sizes

 

Vishay

15-20

Increasing

Lead-times extending on small case sizes A & B

 

Leaded Capacitors - Ceramic

AVX

18-20

Stable

 

 

Murata

18-20

Stable

A lot of parts EOL'd

 

Vishay

12-16

Stable

 

 

NIC Components

14-18

Increasing

 

 

TDK

14-20

Increasing

 

 

Surface Mount General Capacitors – Ceramic

AVX

24+

Increasing

Automotive Specs Sold Out, Allocation on 44 series of parts. Controlled order entry on long list of parts

 

Murata

20-38+

Increasing

Controlled order entry on a long list of parts, mostly large case sizes. EOL notification on many parts

 

Samsung

24+

Increasing

Lead times under pressure, price increases in Q1 2018

 

TDK

24+

Increasing

On severe allocation

 

Taiyo Yuden

30+

Increasing

On severe allocation

 

NIC Components

24+

Increasing

 

 

Yageo

38+

Increasing

Price increase in Q1 2018, Controlled order entry on long list of parts

 

Walsin

40+

Increasing

 

 

Vishay

16+

Stable

 

 

 

Kt Difficult Period in the Electronic Components Field & Coping Strategy

O problema global de suprimentos de matéria-prima se espalhou do MLCC para o ajuste de potenciômetros e outras séries.

O problema é muito mais sério que nossa imaginação.
Os preços dos diferentes produtos continuam aumentando desde 2017, mas a circunstância não parece estar melhorando agora.
Atualmente, o prazo de entrega da matéria-prima tende a ser ampliado.

Como você pode ver, abaixo da liberação atual de informações sobre o lead time de fabricantes de renome mundial, o tempo de espera para componentes ativos tende a ser estendido.
No entanto, o tempo de espera para componentes ativos com o pacote SOT-23 seria o mais longo.

No período difícil no campo de componentes eletrônicos, que tipo de estratégia de enfrentamento deveríamos tomar?
A maioria dos clientes opta por verificar a demanda regular e confirmar a ordem com antecedência.
O que você acha ?

Product

Manufacturer

Price Trend

Current Lead Time(weeks)

Lead Time Trend

Low Voltage Mosfet

Infineon

stable

15~20

extended

Diodes Inc.

stable

10~12

extended

Fairchild(Onsemi)

stable

14~16

extended

On Semi

increase

20~24

extended

Nexperia

stable

20~26

extended

ST Micro

stable

16~18

extended

Vishay

decrease

15~17

stable

High Voltage Mosfet

Infineon

stable

15~17

extended

Fairchild(Onsemi)

stable

14~16

extended

Ixys

stable

17~19

extended

ST Micro

stable

18~20

extended

Rohs

stable

20~22

extended

MS

stable

18~20

stable

Vishay

decrease

15~17

extended

General Diode

Diodes Inc.

increase

14~16

extended

Fairchild(Onsemi)

increase

10~12

stable

Nexperia

increase

10~20

extended

On Semi

increase

20~22

extended

Rohs Semiconductor

stable

14~20

extended

  

Page:[«]1[»]